Tuesday, 13 February 2018

As of the end of June, the job cost sheets at Racing Wheels, Inc., show the following total costs accumulated on three custom jobs


As of the end of June, the job cost sheets at Racing Wheels, Inc., show the following total costs accumulated on three custom jobs. Job 102 Job 103 Job 104 Direct materials $ 41,000 $ 59,000 $ 57,000 Direct labor 15,000 25,400 44,000 Overhead applied 5,850 9,906 17,160 Job 102 was started in production in May and the following costs were assigned to it in May: direct materials, $8,000; direct labor, $3,100; and overhead, $1,209. Jobs 103 and 104 are started in June. Overhead cost is applied with a predetermined rate based on direct labor cost. Jobs 102 and 103 are finished in June, and Job 104 is expected to be finished in July. No raw materials are used indirectly in June. Using this information, answer the following questions. (Assume this company’s predetermined overhead rate did not change across these months.) 1&2. Complete the given below table to calculate the cost of the raw materials requisitioned and direct labor cost incurred during June for each of the three jobs? 3. What predetermined overhead rate is used during June? 4. How much total cost is transferred to finished goods during June?

Contact Us For Tutoring:

Name

Email *

Message *